Reconstruction of the intersection of Shaw Road and 23rd Ave SE/Crystal Ridge Dr. SE, as well as lane widening/realignment of the northbound travel lanes. The roadway will be reconstructed using dense HMA, and the improvements include pedestrian facility retrofits (curb rams and push buttons), traffic signal retrofit to provide flashing yellow arrows, fiber interconnect system, a new southbound right turn lane, widening of the northbound lane, including a gravity block fill wall and slope grading. Existing stormwater facilities will be replaces on the north side of the intersection. Improvements at the southeast corner of the intersection, including removal of the existing Crystal Ridge HOA sign, construct of a gravity block fill wall, and regarding/surface restoration.